Proposition S Projects
Built in 1952 Site Acreage: 3.9 acres
450 Students (2008-09)
Ad hoc task force guiding principles were established to assist in developing educational facilities that:
- Are the heart and soul of the community
- Have parity of the physical facilities and structures
- Improve student learning and achievement
- Improve accountability
Site-Specific Bond Project List
The following needs were identified through a comprehensive planning process, which included input from school site representatives to cluster meetings, district departments and other assessment measures.
The language below will be included in the bond resolution:
Project Improvements to Support Student Learning and Instruction
- Install a wireless network (WIFI)
- Provide 21st century technology upgrades, including audiovisual projection capabilities for all students
School Improvements to Support Student Health, Safety and Security
Provide campus-wide emergency communications system
Expand parking area, providing additional parking spaces
Install security lighting, as well as, increase vandalism and intrusion safeguards, including modifications to fencing
Remove or minimize risks of any potentially hazardous material throughout the facility
Repair/replace/remove old portable classrooms
Projects to Improve School Accessibility, Code Compliance Upgrades
Renovate existing restrooms
Expand restroom capacity to include service at kindergarten classrooms
Improve accessibility to all classrooms, labs, restrooms, and other school facilities to comply with accessibility regulations including ADA Title I & II
Install three-compartment sink in kitchen
Install a grease trap to comply with city regulations in the kitchen
Install new hand sink in kitchen
Major Building Systems Repair/Replacement
Repair site sidewalks, hardscape , landscape and drainage areas to include asphalt overlay and irrigation repair
Repair/replace heating and ventilation systems as needed
Repair/replace deteriorating plumbing and sewer systems
Repair/replace gutters, downspouts, catch-basins and underground piping as required to improve drainage and ponding for student safety where needed
Repair/restore building interiors, exteriors, finishes and fixtures
Replace aging wiring and upgrade electrical systems as needed
Repair/replace/upgrade performance spaces/multipurpose rooms