Prop. S: Building for Success
Thanks to San Diego voters who support investing in the future, our district has funding to renovate our aging schools and upgrading wiring to allow for the most advanced technology for our students.
On Nov. 4, 2008, nearly 69 percent of voters in San Diego passed the $2.1 billion general obligation bond measure, Prop. S.
This bond program will provide resources to repair, renovate and revitalize 181 neighborhood schools. Prop. S extends the previously voter approved Proposition MM tax rate ($66.70 per $100,000 assessed value of taxable property), from 2029, to 2044. We thank you again, San Diego, and our students will thank you for generations to come.
Project Improvements to Support Student Learning and Instruction
• Retrofit/build spaces to provide new and updated career technical learning environments for the Construction Tech Academy and othersupporting educational spaces
• Provide 21st century technology upgrades, including audiovisual projection capabilities for all students
• Install a wireless network (WIFI)
School Improvements to Support Student Health, Safety and Security
• Replace obsolete fire alarm and emergency communications system
• Install new food kiosks and renovate food service area, including cafeteria, to increase service efficiency and provide healthier food choices
• Install security lighting, as well as, increase vandalism and intrusion safeguards, including modifications to fencing and gates, to secure site
• Remove or minimize risks of any potentially hazardous material throughout the facility
• Improve student drop-0ff and pick-up areas
Projects to Improve School Accessibility, Code Compliance Upgrades
• Renovate existing restrooms and locker rooms
• Renovate gym, including new bleachers, to meet accessibility regulations
• Improve accessibility to all classrooms, labs, restrooms, and other school facilities to comply with accessibility regulations, including ADA Titles l & ll
• Install grease trap and other fixtures to comply with codes in kitchen
• Renovate old bleachers, including press box, and upgrade fields for safe use and compliance with accessibility regulations
• Build new two-story classroom building to replace old portable classrooms
• Provide new accessible restrooms for stadium
• Provide accessible weight room/fitness space to meet standards
Major Building Systems Repair/Replacement
• Repair/replace deteriorating sewer and plumbing systems as necessary
• Repair /replace roofing as needed
• Address water leaks in auditorium
• Repair/upgrade building interiors, exteriors, finishes and fixtures
• Repair/replace heating and ventilation system where needed
• Provide ventilation for room 909
• Repair/replace aging wiring and upgrade electrical systems including lighting
• Repair/replace/upgrade performance spaces