Proposition S Bond Projects
The following needs were identified through a comprehensive planning
process, which included input from school site representatives to
cluster meetings, district departments and other assessment measures.
The language below will be included in the bond resolution:
Project Improvements to
Support Student Learning and Instruction
- Install a wireless network (WIFI)
- Provide 21st century technology upgrades, including audiovisual
projection capabilities for all students
School Improvements to Support Student
Health, Safety and Security
- Provide campus-wide emergency communications system
- Improve student drop-off and pick-up areas
- Expand parking area, providing additional parking spaces
- Install security lighting, as well as, increase vandalism and
intrusion safeguards, including modifications to fencing
- Remove or minimize risks of any potentially hazardous material
throughout the facility
Projects
to Improve School Accessibility, Code Compliance Upgrades
- Renovate existing restrooms
- Improve accessibility to all classrooms, labs, restrooms, and
other school facilities to comply with accessibility regulations
including ADA Title I & II
- Install three-compartment sink in kitchen
- Install a grease trap to comply with city regulations in the
kitchen
- Install new hand sinks
Major Building Systems Repair/Replacement
- Repair site sidewalks and hardscape areas
- Repair/replace heating and ventilation systems as needed
- Repair/replace deteriorating plumbing and sewer systems
- Replace aging wiring and upgrade electrical systems as needed
- Repair and replace gutters, downspouts, catch-basins and
underground piping as required to improve drainage and ponding for
student safety where needed
- Replace deteriorated flooring as needed
- Repair/resurface worn and damaged concrete and asphalt paving
where needed
- Repair/upgrade building interior/exterior finishes and fixtures
as needed
- Repair/replace/upgrade performance spaces/multipurpose rooms